Install j channel along the top edge of the wall.
Starting siding from top.
Begin by installing the first row of siding on both sides of the deck.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Start fastening in the center of the panel and work toward the ends.
Cut the siding short when cutting vinyl siding it s usually to go into a corner.
The most common approach here is to install sill trim at the soffits rip down the top course of siding and crimp the siding so the sill trim holds it in place.
Once you ve decided where you want the siding to begin drive a nail through a point on your chosen starting height and snap a chalk line around the perimeter of the house.
This is where the new siding will begin.
Measure down from the top of the installed board 1 1 4 inches every four feet and make a mark.
You need to leave at least 1 4.
We cover how to move doors and windows and create a weather proof exterior.
Interlock one panel with the siding panel below hold the other piece on top against the gable.
This is our most comprehensive.
Not just another vinyl siding installation video.
Nail a piece of plywood about 3 5 inches 89 mm thick along the top of the chalk line this will hold out the bottom of the first row of siding.
To provide a common reference point measure up 8 in.
From the top of this row and stretch a string line across the deck.
This piece is now a pattern for cutting panels to fit along one side of gable.
Vinyl siding starter strips snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Then mark a line on bottom piece and cut.
Start fastening vertical siding and corner posts in the top of the uppermost slots to hold them in position.
The j channel at the top of the surface you re working on will receive one end of the siding panels while the j channel at the bottom will receive the other end.
Hold a hardieplank siding board with the top edge against the chalk line and 1 8 inch away from the corner trim.
Pay close attention to the area where the top row of siding meets the soffits.
Nail the board to the house every 16 to 24 inches with a roofing nail along the nail line printed on the top of the siding board.
Place all other fasteners in the center of the slots.