However engineering determines the optimal spacing between the purlins.
Spacing for purlins forfiber glass roof panels.
Once the purlin spacing is determined then the metal roofing panels are typically attached to every line of purlins.
On a standard load most designs call for purlin placement at five foot intervals.
The wider the roofing panels the greater spacing distance you should put.
While panels may not fail under heavy snow loads strain at fastening points can cause slight cracking.
Purlin spacing is dependent on profile of the metal and gauge plus snow and wind load plus what the rafters are designed to carry.
Wider panels allow for greater spacing between rafters.
R panel install 11 21 11 metal roofing materials metal the r panel metal roofing panel is an industry leader purlins decks and fasteners must be designed to resist all loads imposed on the panel ng winds 2 1 3 4 5 install metal directly to wood frame use maximum 5 purlin spacing install metal not recommended for heated.
There are countless old corrugated roofs out there with 2 5 2 67 2 75 and 4 25 rib spacing as well as other ribbed type panels such as the 7 2 industrial rib roof panel.
A metal roof must also allow for some overlap on each side of the panels which will reduce the effective width of the panel.
To install corrugated roofing start by cutting your panels to length with an angle grinder.
The purpose of the purlins is to provide a solid foundation for the metal roofing panels and trim to be screwed to.
The metal roof purlins spacing must be done correctly within narrow tolerances.
An engineer will use a load chart in order to determine the spacing between metal purlins.
The width of metal panels will determine the rafter spacing.
Table is based on section properties or actual load tests available upon request.
When looking at the ends of the rails the purlins shapes look like the letter c or the letter z the eave purlin marks the first purlin at the wall connection.
Purlins are non pressure treated 1 x 4 x 12 lumber that is installed on to the roof in a specific layout pattern and screw pattern.
Without a set of blueprints with a pe s seal you have no option but to follow the inspectors gig.
Fyi we run purlins on 3 5 feet on center depending on size of purlin.
These roofs are commonly problematic because the rib spacing is typically inconsistent thus not permitting a standard factory notched hugger sub purlin to be used.
This will depend upon the type of panel that is used and the thickness of the steel.
Beginning at the outside edge of your roof place each panel directly onto the purlins that are attached to the roof trusses.
Screw line spacing for metal roofing over metal purlins.
To determine how far apart to set rafters measure the width of the metal panel and then the width of the first hill and valley of the panel.